Reconstruction of train of FUBA line
In 2012, BSR completed the reconstruction design of the train of FUBA line. The vehicle was installed with air conditioning system in the passenger compartment, and the bogie and interior decoration in the passenger compartment were reconstructed, which improved the riding environment and passenger comfort, and fully met the operation requirements of line 1.
In 2014, combined with the new signal transformation of the line, BSR redesigned and reconstructed the vehicles of FUBA line again to realize ATO automatic driving, further improve the safety and reliability of vehicles of Beijing subway FUBA line, provide a strong guarantee for reducing the departure interval, improving the operation efficiency of single set of vehicles.
|